Skip to content

Build Process ​

Here are a collection of screenshots (some with descriptions) that show the build stages in order of old to most new.

A very basic test made before the comp, just something to work off in my head. Image

The first stages of the build, however I decided to work top to bottom. This ended up being a mistake later on. Image

Image

Image

Removed the top cabin and fixed some proportions. I also got the wood texture sorted out. Image

Image

The second attempt, started over and made a slightly darker texture for the wood. Working bottom to top should have been more obvious. Image

More woodwork. Image

Added the background. Image

Image

Added the base for the cabin alongside texturing for the support beams. Image

Image

A method I used to generate grass. As shown with glass and wool, the grass length is determined by light, while the grass density is determined by moisture. I then coded a brush using Axiom's Script Brush feature to combine these factors into "real" grass. Image

Working on the Frog Easter Egg. Image

Finished the base for the cabin to rest on. Image

Some props, including the Snail. Image

Plywood made with Voroni and Simplex noise. Image

Started work on the cabin. Image

Added slanted planks for the walls and added support for the roof. Image

Finished the roof, added railing added a pulley and added a chimney. Image

Started work on the interior and added windows. Image

Added nails to the roof and the rest of the build. Image

Added more props. Image

Added a TV antenna. Image

Added further texturing to wooden surfaces using a custom script which detects edges and provides the appropriate stair direction and type. Image

Redid the windows as the scale was off. Image

Screenshot with the background added. Image

Added further texturing to the walls and added gas canisters. Image

Redid the interior to match the correct scale. Image

Moved the bed and added a stove connected to the gas canisters, drawers and a wood burner. Image

Added an attic entrance. Image

Added a ladder prop and changed the gas canister colour to red. Image

Added further interior decorations. Image

Fixed more incorrectly scaled parts of the build, including the railing and pulley. Image

Even further interior decor. Image

Image

Image

Added a log pile to the western side of the cabin. Image